Skip Main Navigation
Page Content

Gerald Desmond Bridge Replacement Project

The $1.47 billion bridge project is a joint effort of Caltrans and the Port of Long Beach, with additional funding support from the U.S. Department of Transportation and the Los Angeles County Metropolitan Transportation Authority (Metro). When completed, the new bridge will include six traffic lanes and four emergency shoulders, a higher clearance to accommodate large cargo ships, a bike and pedestrian path with scenic overlooks, and more efficient transition ramps and connectors to improve traffic flow.

Save This Event

Event Saved