This event has ended
LEARN METHODS TO DECREASE LABOR COSTS, INCREASE EFFICIENCIES AND DECREASE PROJECT DURATIONS

Crew Centered Construction in a Lean Project Environment

Construction Concepts

Monday, April 22, 2013 at 8:00 AM - Tuesday, April 23, 2013 at 12:00 PM (EDT)

Charlotte, NC

Crew Centered Construction in a Lean Project Environment

Ticket Information

Ticket Type Remaining Sales End Price Fee Quantity
CONFERENCE COST PER ATTENDEE Sold Out Ended $750.00 $32.45

Who's Going

Loading your connections...

Share Crew Centered Construction in a Lean Project Environment

Event Details

Conference

Crew Centered Construction
in a Lean Project Environment

See below for Hotel Accomodations

Crew Centered Construction in a Lean Project Environment is a Conference to introduce a package of proven lean construction concepts and a crew level construction operation engineering methodology designed to improve project predictability and crew level performance. 


The Conference on Crew Centered Construction will showcase projects and techniques from contractors throughout the country that have adopted a crew-centric focus and that have begun to get the bulk of the waste out of their construction operations at the crew level. 

Additionally we will introduce improvement strategies and production management methodologies for those who wish to increase performance at both the project and crew levels.


Crew Centered Daily Production Assignments

 

 

Construction Concepts_Crew Centered Construction

Lean Construction Institute research shows that in the construction industry, only 54% of scheduled weekly crew assignments are completed as planned. 

Additionally, Construction Concepts research and successes have shown that “average” construction operations and crews can routinely perform at rates 4 to 10 times better than the current  “estimated” or “budgeted” rates when performing in a high quality work environment.   However this is rarely and seldom achieved.

The difference between these potential production rates versus “budgeted” or estimated performance is going unnoticed throughout the industry.  Budgets associated with most operations are based on previous work that was burdened with waste.

We want to change that.  
Read More.....

 

Another Successful Project Example

 Current List of Conference Presentations:
Presentations will be from, but not limited to Heavy Civil, Roadway, Power, Petro-Chemical and Structural Concrete Contractors


UCI -
Wichita, Kansas
  • iPad Applications at the Crew Level. 
  • Kitting; How the Operation Support Center is Prepackaging and Modularizing Job Kits
  • “One on Ones” for crew development
  • "What a Crew Needs”
Gilchrist Construction Company - Alexandria, Louisiana
  • Understanding Crew Workflow Using Value Stream Production Planning
J P Cullen and Sons -
Janesville, Wisconsin
  • Leadership at the Project Level
Wharton Smith Incorporated, -Orlando, Florida
  • Getting the Theory of Constraints Understood at the Project Level
READ A MORE DETAILED AGENDA 
Construction After Action Review in the Field


To reserve your room at the special discounted rate of $104.00, please contact Reservations at 1.800.HILTONS and reference the group name Construction Concepts. Alternatively, you may choose to reserve online at www.hilton.com and enter the group code CCA13. Rate is for standard King or Queen/Queen room, and is only available until April 1, 2013.

The Hilton is located at 5624 Westpark Drive, Charlotte, NC 28217. Check in time is 3pm and checkout is noon. The hotel is 100% non smoking. 

 

 

Have questions about Crew Centered Construction in a Lean Project Environment? Contact Construction Concepts

When & Where



Hilton Charlotte Executive Park
5624 Westpark Drive
Charlotte, NC 28217

Monday, April 22, 2013 at 8:00 AM - Tuesday, April 23, 2013 at 12:00 PM (EDT)


  Add to my calendar

Organizer

Construction Concepts

Construction Concepts helps construction companies that self perform and/or manage self performing construction crews to steadily & safely improve crew performance and project reliability. 

We are excited to offer this conference to current, former and non-clients so that we can further improve the work at the crew level and project throughput in the construction industry. 

  Contact the Organizer

Please log in or sign up

In order to purchase these tickets in installments, you'll need an Eventbrite account. Log in or sign up for a free account to continue.