Skip Main Navigation
Page Content

Save This Event

Event Saved

ASCE NJB Technical Dinner: Kosciuszko Bridge Phase 1

ASCE North Jersey Branch

Thursday, November 30, 2017 from 5:30 PM to 8:30 PM (EST)

Ticket Information

Ticket Type Sales End Price Fee Quantity
ASCE Members Nov 29, 2017 $65.00 $0.00
Government Employees Nov 29, 2017 $60.00 $0.00
Non-ASCE Members/Guests Nov 29, 2017 $70.00 $0.00
Students Nov 29, 2017 $40.00 $0.00
Speaker Nov 29, 2017 Free $0.00

Share ASCE NJB Technical Dinner: Kosciuszko Bridge Phase 1

Event Details

"Kosciuszko Bridge Phase 1 Brooklyn Connector: Safeguarding the Public Through Geotechnical Engineering Risk Management"
Thursday November 30, 2017
Crowne Plaza - Fairfield, NJ

Presented by:

Matthew Riegel, PE (NHTB) and Paul B. Pizzimenti, PE (Harley & Aldrich)

Registration and Reception from 5:30 pm – 6:30 pm

Dinner at 6:30 pm with Presentation to follow 

The New York State Department of Transportation (NYSDoT) has undertaken the Phase 1 construction of the I-278 Kosciuszko Bridge replacement over Newtown Creek between Brooklyn and Queens, NY through a design-build contract by a team consisting of the joint venture between Skanska, Kiewit, and Ecco III Contractors (SKE) and HNTB as the lead Designers with Haley & Aldrich as a specialty geotechnical subconsultant.

As part of the project design requirements and phasing, new connector roadways leading into the new approach structures were to be constructed underneath existing active connector roadways.  SKE sought to use traditional staged earth‐filled embankments utilizing prefabricated modular retaining walls (T‐Walls®) in lieu of lightweight alternatives for cost, schedule, and logistic reasons.  The existing connector consisted of a shallowly-founded, rigid concrete framed column supported elevated roadway. 

The proposed portion of the alignment is being constructed beneath heavily travelled Brooklyn Queens Expressway (BQE) viaduct while the existing viaduct remains in service.  The burden of proof fell upon the designers to determine the impacts and a means for managing the risks of excessive ground settlement. This presentation will focus on the unique design challenges associated with construction in low overhead conditions and how potential impacts to the BQE were mitigated during construction allowing the SKE team to install the embankment in a limited access area underneath an active viaduct supported on settlement sensitive shallow foundations. A discussion of the subsurface investigation and settlement assessment of the soils supporting the existing BQE are a critical aspect of this design, as their behavior drives the deformation of the viaduct. Additionally, the construction monitoring program used to enable the designer to assess settlement predictions as they relate to the true behavior of the soils and structure will be presented

 

 

Please reserve your tickets now throught Eventbrite!

Payment options include: credit card (pay here at Eventbrite at time of purchase) or check (reserve tickets here and bring check to the event).  If paying by check, please make checks payable to: ASCE North Jersey Branch, and please bring check to event on Nov. 30th.

Have questions about ASCE NJB Technical Dinner: Kosciuszko Bridge Phase 1? Contact ASCE North Jersey Branch

Save This Event

Event Saved

When & Where


Crowne Plaza Fairfield, NJ
690 U.S. 46
Fairfield, NJ 07004

Thursday, November 30, 2017 from 5:30 PM to 8:30 PM (EST)


  Add to my calendar
ASCE NJB Technical Dinner: Kosciuszko Bridge Phase 1
Things to do in Fairfield, NJ Networking Business

Please log in or sign up

In order to purchase these tickets in installments, you'll need an Eventbrite account. Log in or sign up for a free account to continue.