Skip Main Navigation
Page Content
This event has ended

McKenzie Solar 30MW Power Plant Tour

USGBC-Northern California Chapter

Thursday, August 23, 2012 from 5:00 PM to 7:30 PM (PDT)

McKenzie Solar 30MW Power Plant Tour

Ticket Information

Ticket Type Sales End Price Fee Quantity
USGBC-NCC & NorCal Solar Members
USGBC-NCC Member rates are for individual Chapter Members only; membership status will be verified prior to the event. Non-member attendees who purchase this ticket type will be required to pay the full rate at the door on the day of the event. If you are unsure of your membership status, please email membership [at] usgbc-ncc.org. Membership of USGBC-NCC is held by individuals, not companies. Membership benefits, therefore, cannot be transferred to other individuals within the same company or public agency. Please be sure that you are a Chapter member if you have chosen a Member discount ticket type.
Ended $15.00 $1.29
Non-Members
For anyone who is not a member of USGBC-NCC or NorCal Solar. Sign up for membership and receive the Member ticket price today by joining at www.usgbc-ncc.org/membership
Ended $30.00 $1.59
Students
Please bring student ID.
Ended Free $0.00

Share McKenzie Solar 30MW Power Plant Tour

Event Details

Please join us for a tour of one of the largest renewable energy projects currently under construction in Sacramento County. The McKenzie solar project is a distribution scale, 30 megawatt (MW-ac) solar photovoltaic power plant located on 230 acres of agricultural land in rural and unincorporated Sacramento County neat Galt, CA. This project, which is part of the Sacramento Municipal Utility District (SMUD) feed-in tariff program (FIT), is helping to meet the near-term renewable energy goals of Sacramento. This design/build project includes the design and construction of the photovoltaic arrays, which utilizes a single-axis tracking system to optimize kilowatt hour production, as well as the required substation and interconnection. Project construction began in spring on 2012 and is expected to be producing power by the end of 2012. This event is a joint event with the Northern California Solar Energy Association.

Image    Image    Image


Speakers

ImageGrant French, LEED AP BD+C, Corporate Sustainability Manager, Swinerton Builders
As Corporate Sustainability Manager at Swinerton Builders, Grant French provides data and intelligence to each office of the Swinerton family of companies, to stimulate and support the successful pursuit and execution of Green and LEED projects. He provides input in the RFQ and Proposal Process for Green/LEED Projects and also serves as a Green resource throughout project delivery. Grant initiates and manages job-specific and LEED Accreditation Green Training Programs. On an ongoing basis, he works with various teams to evaluate and strive towards continual improvement in jobsite and office sustainable practices. Mr. French’s project experience includes: Orchard Garden Hotel, San Francisco, CA; Orchard Hotel, San Francisco, CA; Jane D’Anza Convent, San Rafael, CA; Golden Gate Park Music Concourse and Underground Parking Facility, San Francisco, CA; and River Rock Casino, Geyserville, CA. His professional experience prior to joining Swinerton Builders includes work with William McDonough+Partners, Institute for the Built Environment, The Hoffman Corporation and McRaven Restorations. Mr. French is currently on the USGBC-NCC Board of Directors.

ImageDonny Gallagher, P.E., LEED AP BD+C, Project Engineer, RBF Consulting
After graduating from UC Davis with his BS in Civil Engineering, Donny joined RBF Consulting’s Sacramento office. As a project engineer at RBF, Donny focuses on entitlements and civil design for a diverse range of multidisciplinary projects including utility scale renewable energy projects, military base rehabilitations, hospital expansions, commercial developments, residential developments, utility infrastructure, roadway/roundabout design, and highway realignments. Donny's recent project experience includes the Salinas Valley Memorial Healthcare System Seismic Upgrade and Modernization Project, the new Calaveras County Detention Center and Sherriff’s Administration Office (the single largest public works project in Calaveras County history), and numerous large scale solar projects throughout California. Donny is currently the Vice Chair of the USGBC-NCC Capital Branch.

 

 


Learn more about the USGBC-NCC Capital Branch.

Refund and Cancellation Policy

Please note the following policies:

  • All sales are final and we do not offer refunds.
  • Should USGBC-NCC have to postpone or reschedule the workshop or event, you will receive a 100% refund.
  • Registration cannot be transferred to another workshop or event.
Have questions about McKenzie Solar 30MW Power Plant Tour? Contact USGBC-Northern California Chapter

When & Where


McKenzie Solar 30MW Power Plant
12305 McKenzie Road
Galt, CA

Thursday, August 23, 2012 from 5:00 PM to 7:30 PM (PDT)


  Add to my calendar

Organizer

USGBC-Northern California Chapter

USGBC-NCC is a membership-based organization that promotes and advocates for green building. Learn more about the Chapter, our Board of Directors, and Staff.

Learn more at www.usgbc-ncc.org.

  Contact the Organizer

Please log in or sign up

In order to purchase these tickets in installments, you'll need an Eventbrite account. Log in or sign up for a free account to continue.